Date | 2018.09.06 |
---|---|
Class | Project |
Project | P005 Glen Williams |
Project Sub-Category | Project Construction Administration |
Task | Phone call with Brian. Post locations will be off centre. Look up coverage for MPB66Z (5"). Decide to shift all connectors 2" to the North to centre structure around windows. Second issue, connecting sloped roof to fascia level with shingles. Decide to step down new roof from existing shingles, overlap 1-2" of abutting rafter plus full depth of purlins with facsia. Cut reglet into fascia and install continuous folded edge of Sun-Tuf wall flashing into reglet and fold over sun-tuf flutes. |
Hours | 0.75 |