Create New Entry
 

Date2018.09.06
ClassProject
ProjectP005 Glen Williams
Project Sub-CategoryProject Construction Administration
Task

Phone call with Brian. Post locations will be off centre. Look up coverage for MPB66Z (5"). Decide to shift all connectors 2" to the North to centre structure around windows. Second issue, connecting sloped roof to fascia level with shingles. Decide to step down new roof from existing shingles, overlap 1-2" of abutting rafter plus full depth of purlins with facsia. Cut reglet into fascia and install continuous folded edge of Sun-Tuf wall flashing into reglet and fold over sun-tuf flutes.

Hours0.75